Method guide ·
Kill criteria for AI research, and deciding when to stop
AI agents make it cheap to start a research idea and hard to admit it is dead, because there is always one more run to try. A kill criterion written before the work starts makes that call in advance. This page covers how I rank ideas, the prior-art search that ends most of them, stop rules for long runs, real stops from the record, and how to write up the no.
Kill criteria, defined
A kill criterion is a result, written down before the work starts, that ends the project if it happens. Product teams use them so that the decision to stop is made calmly by the people who planned the work, before months of effort make stopping feel like a loss. With agents the same pressure arrives faster. An agent will cheerfully propose another run, another variant, another angle, and describe each one as promising.
I write two kinds. A project kill names the finding that ends the idea: earlier work that already has the result, a check showing the effect is true by definition, or a known value the method cannot reproduce. A run stop says when a long computation ends whatever it has found, by size, by time or by condition, with a date on which a decision gets made either way.
The prior-art search comes first
Many of my ideas end at the first gate, which is the cheapest place for them to end. Before anything expensive is built, I have a helper agent look for earlier work, known as prior art, with one job: find it. In one run, agents tested whether the 25.8 million parking tickets Los Angeles publishes held a finding new enough for a research paper, and each of the helpers that tried to knock its ideas down took four to six minutes. One, on the run's first leading idea, found a 2012 patent on working out officer revisits from ticket times. Another found the second leading idea, a pile-up of street-sweeping tickets right after sweeping starts, already shown in public, including by a civic project in San Francisco. The step that would have cost the most, matching every ticket to the parking rules posted on its street, was never built (what those quick checks caught).
Skipping the search has a cost even after posting. On November 27 LuminaBench, a GitHub account that posts AI-made Lean proofs of published conjectures, withdrew one of its own results, a counterexample to a formula of the mathematician Zhi-Wei Sun's, after finding that Kevin Calderon had already found the same exception and proved the corrected formula in October (my news item on LuminaBench). The withdrawal is in the repository's public history, and a search before posting would have found the paper.
A search can only show that something was not found where I looked, so the record says exactly that.
Ranking the idea list
Agents generate ideas faster than anyone can test them, so the list needs an order. Product teams often use WSJF, weighted shortest job first, which the Scaled Agile Framework describes as "a prioritization model used to sequence work for maximum economic benefit", estimated as "the relative cost of delay divided by the relative job duration". The instinct behind it is sound: do the valuable, quick things first.
For research I rank on three things instead: how checkable the answer is, how cheap the first decisive test is, and whether the prior-art search has been done yet. SAFe's version of WSJF has one input, opportunity enablement, for work that makes other work possible; in research the dependencies often run deeper than one input can carry, since one result is often the tool for the next. So I let a score sort the list and then make the order by hand, writing down why.
Setting expectations belongs in the ranking too. The plan for the parking-ticket run said, before any agent started: "If 9 ideas are already published and only 1 survives, that is an excellent outcome." Written in advance, a line like that makes a run of kills read as the process working.
Stop rules for long runs
A long computation needs its stop written at launch, along with something that records the stop when it happens. I learned the second part the hard way. In September 2026 two of my long computer searches were each trying to beat a best value that mathematicians had published, with the rule that a full day without improvement ends the search. Both stopped under that rule on September 5, without beating the published values, as the plan had said was most likely. Nothing wrote the stops down, and the page where my agents track each piece of work kept saying "running" for six days (the lesson on stale status words). Every long run now gets a small watcher program that writes to the log the moment the job ends.
Checking needs a stop rule as well. My instructions for the parking-ticket run called for two to four helper agents at every major step. After eleven helpers in all, the lead agent judged that more would only repeat checks already done, wrote down that decision and its reason, and told me.
Real stops from the record
| Run | What ended it | Outcome | Where to read it |
|---|---|---|---|
| Ten ideas for a research paper from Los Angeles parking tickets, September 2026 | Prior-art searches found both leading ideas partly done; matching tickets to street rules proved hard | Stopped at "not yet" before the most expensive step; no paper until a fuller search for earlier work, the matching step and a street-by-street test | The run, start to finish |
| Two long searches for better values than the published ones, September 2026 | Their own stop rules, on September 5 | Ended without beating the published values, as the plan expected | The stale "running" |
| A counterexample posted by LuminaBench, withdrawn November 27, 2026 | An October 2026 paper by Kevin Calderon already covered it | The withdrawal is in the repository's public history | News item |
Writing up the no
A stopped project deserves the same write-up as a finished one, or the next person with the same idea starts from zero. Mine is eight lines: the question, the answer, a score on a scale set before starting, the closest earlier work, what ended each idea, how sure I am and who says so, what would change the answer, and the checks I chose not to run. Write up a "no" as carefully as a "yes" has the template and the parking-ticket run's full verdict, and Managing AI agents like a product manager puts stop rules next to the other habits.
Short answers
What are kill criteria?
Results written down before a project starts that end it if they happen, such as finding the result already published, or the method failing to reproduce a known value. Writing them first means the decision to stop is made before effort and hope build up.
What is WSJF?
Weighted shortest job first, a way to order a backlog. The Scaled Agile Framework estimates it as the relative cost of delay divided by the relative job duration, so valuable, quick items go first.
When should an AI research project stop?
When a kill criterion written in advance is met, when a long run reaches its stop rule, or when new checks only repeat what earlier ones found. The decision and its reason go in the record the same day.
How should a failed research idea be written up?
With the question, the answer, a score on a scale set in advance, the closest earlier work, what ended each idea, who is saying so and how sure, what would change the answer, and the checks not run.
Did this make sense?
Was this helpful?
Learn to do real math research with AI agents
Get the lessons by email and hear first when the live course opens.